Hard Precast Building Systems (HPBS) is one of the leading precast concrete companies in the UAE. HPBS delivers “Total Precast Solutions” from design & value engineering to manufacture, logistics and installation of precast cement products. HPBS supplies precast concrete products on a large scale, both to ASGC and also to third parties. The company’s production facility, located in Dubai Investment Park, is one million sq.ft. and utilizes the latest pre-cast technology from market leaders such as Avermann (Germany), X-Tec (Finland), Wiggert (Germany) and Konecranes (Finland). The factory’s production capacity is 150,000 m3 per year and has a strong fleet of 106 trailers & trucks. HPBS pioneered the market with high quality precast elements such as: Insulated Sandwich Walls (load & non-load bearing), Solid/ Internal Walls (load & non-load bearing), Cladding Walls (exposed aggregates, grey and pigmented finishes), Pre-stressed Hollow Core Slabs covering spans up to 24m, Precast & Pre-stressed Beams & Columns, Boundary Walls & Footings, GRC, etc.

26
Years
Experience
Working
70+
Projects
Executed
100+
Clients

Durability

Studies have shown that precast concrete can provide a service life of more than 100 years, reducing maintenance and operating costs.

Safety

Precast concrete is non-combustible with built-in fire-resistant capability. It creates a safe envelope that helps protect people, equipment and the building itself.

Easy Installation

Precast concrete products save time—they arrive at your job site ready to install.

Quality

HPBS Precast concrete is produced in an environment that is under stringent quality control underlined by the various awards and certificates received by HPBS.

Sustainability

Our precast concrete solutions are environmentally friendly, reducing carbon footprint and promoting green building practices.

Customization

With versatile design options, our precast products are tailored to meet your specific project requirements, ensuring both functionality and aesthetics.

Latest Projects

Coca Cola Arena

  • Application: 13 Building - Cladding
  • Project Sector: Full Precast System
  • Duration: 7 Months
  • Building up Area: 40,000 m2
  • Precast Panels: 4,617 Pcs
  • Precast Hollow Core Slabs: 4,675 Pcs
  • No of trips on Trailers to Site: 1,753
  • Developer
  • Main Contrator

Business Bay Square Dubai

  • Application: 13 Building - Cladding
  • Project Sector: Residential - High Rise
  • Duration: 24 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator

Al Falah Development

  • Application: 371 Villas - Full Precast System
  • Project Sector: Residential - Villas
  • Duration: 17 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator

Mira Oasis Townhouses Dubai

  • Application: 118 Villas - Full Precast System
  • Project Sector: Residential - Villas
  • Duration: 9 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant

Wooden Hozirontal Villa

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 3.5 Months
  • Building up Area: 18,005 m2
  • Precast Panels: 4003 m3
  • Precast Hollow Core Slabs: 17,470 m2
  • Developer
  • Main Contrator
  • Consultant

GEMS Winchester School - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 6 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant

Green Community Motor City - Dubai

  • Application: 137 Villas - Full Precast System
  • Project Sector: Residential - Villas
  • Duration: 7 Months
  • Building up Area: 37,548 m2
  • Precast Panels: 12,836 m2
  • Precast Hollow Core Slabs: 3,884 m2
  • Developer
  • Main Contrator
  • Consultant

The Villa - Phase II and III - Dubai

  • Application: 371 Villas - Full Precast System
  • Project Sector: Residential - Villas
  • Duration: 6 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant
    Shadid Engineering Consultants

City Walk Development - Dubai

  • Application: Full Precast System
  • Project Sector: Residential - Mid-Rise
  • Duration: 8 Months
  • Building up Area: 63,153 m2
  • Precast Panels: 10,121 m3
  • Precast Hollow Core Slabs: 48,397
  • Developer
  • Main Contrator

IKEA Distribution Center - Dubai

  • Application: Full Precast System
  • Project Sector: Industrial
  • Duration: 6 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant

Nestle Dubai World Center - Dubai

  • Application: Full Precast System
  • Project Sector: Industrial
  • Duration: 2 Months
  • Building up Area: 3,397 m2
  • Precast Panels: 749 m3
  • Precast Hollow Core Slabs: 2,518 m2
  • Developer
  • Main Contrator
  • Consultant

GEMS United Academy - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 2 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant

GEMS Founders School Al Mizhar - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 4 Months
  • Building up Area: 21,113 m2
  • Precast Panels: 4,947 m3
  • Precast Hollow Core Slabs: 18,520 m2
  • Developer
  • Main Contrator
  • Consultant

GEMS Founders School Al Mizhar - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 7 Months
  • Building up Area: 28,737 m2
  • Precast Panels: 5,129 m3
  • Precast Hollow Core Slabs: 25,584 m2
  • Developer
  • Main Contrator
  • Consultant

GEMS Founders School - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 2 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant

Dubai Heights School - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 4.5 Months
  • Building up Area: 23,199 m2
  • Precast Panels: 6,517 m3
  • Precast Hollow Core Slabs: 21,132 m2
  • Developer
    Sultan Ahmad Sultan Bin Sulayem
  • Main Contrator
  • Consultant

South View School Remraam - Dubai

  • Application: Full Precast System
  • Project Sector: Education Building
  • Duration: 4.5 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer

  • Main Contrator
  • Consultant

HPBS Office Building - Dubai

  • Application: Full Precast System
  • Project Sector: Commercial Building
  • Duration: 16 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contrator
  • Consultant
    Mashoor Engineering Consultants

Ruwais Private School - Abu Dhabi

  • Application: Full Precast System
  • Project Sector: Education
  • Duration: 4 Months
  • Building up Area: 23,834 m2
  • Precast Panels: 6,909m2
  • Precast Hollow Core Slabs: 18,531 m2
  • Developer
  • Main Contractor
  • Consultant

Deira Islands - Night Market and Boardwalk

  • Application: 73 Buildings - Insulated & Solid Cladding
  • Project Sector: Commercial
  • Duration: 8 Months
  • Building up Area: N/A
  • Precast Panels: 9,580 m3
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contractor
  • Consultant

Marina Bay - Abu Dhabi

  • Application: Beam + HCS + Stairs
  • Project Sector: Residential - High Rise
  • Duration: 7 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contractor
  • Consultant

Maple 2 Town Houses

  • Application: 100 Villas - Full Precast System
  • Project Sector: Residential - Villas
  • Duration: 8 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contractor
  • Consultant

Maple 3 Town Houses

  • Application: 72 Villas - Full Precast System
  • Project Sector: Residential - Villas
  • Duration: 4 Months
  • Building up Area: N/A
  • Precast Panels: N/A
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contractor
  • Consultant

Valiant Clinic Dubai

  • Application: Cladding
  • Project Sector: Healthcare
  • Duration: 2 Months
  • Building up Area: N/A
  • Precast Panels: 442 m2
  • Precast Hollow Core Slabs: N/A
  • Developer
  • Main Contractor
  • Consultant
    HYDER

Our Leader's Message

Our Clients

Dubai Industrial park, Dubai

Jebal Ali

Email: mail@hpbs.ae

Call directly:

+971 4 885 0058

Follow us
Thank you!. Your message is successfully sent...
We're sorry, but something went wrong